Case HistoriesNews

TONGARIRO POWER SCHEME WAIHOHONU

PROJECT:                          Provide a wear resistant lining to badly eroded intake chamber in bed of Tongariro River

Client                                Genesis Power Limited

Consultant:                     Maunsell

Client Engineer:             Ian Meredith

Contractor:                     Polymer Group Ltd

Substrate:                       Severely eroded concrete to below reinforcing

This project was managed by Polymer Group Ltd

Contact Ron Avery on mob 021 956 211, or

Email: avery@polymer.co.nz

Specification:   Abrasive blast to clean profile.  Prepare surface with Enduragrout to eroded substrate.

Apply up to 10mm Enduracoat Tankguard WW as necessary to achieve specified finish.

Cure in 24 hours.